Commercial Roof Glazing
Can a worker stand on the roof glass to inspect it?
Access must follow an assessment of the designed system and current condition. Do not assume the glazing is a walking surface.

Commercial Roof Glazing — planning the work
For commercial roof glazing, dimensions alone do not define a suitable pane. Glass construction, edge support and the surrounding frame affect the specification and fitting arrangements.
More questions
about this service.
Will applying fresh sealant solve every leak?
Water may enter through damaged panels, drainage details or other joints that need separate repair.
How is the quotation worked out?
Investigation, temporary protection and work to adjoining roof components must be separately identified. The roof-glass specification, handling weight, access method and weathering details influence cost.
How should access to the roof be arranged?
The specialist must assess an appropriate method; neither the glass nor adjacent roofing must be assumed capable of supporting a person.
What should be covered at handover?
Check fit, seals, finish and relevant operating checks.
Commercial Roof Glazing by area
Select a place to view this service for that location. Please provide the postcode when you enquire.